VRV & VRF systems
New installations, replacements and alterations for commercial buildings and occupied sites.
PRECISION COOLING • CRITICAL ENVIRONMENTS • COMMERCIAL HVAC
CCU and CRAC replacement, refrigeration infrastructure and technically demanding commercial systems — from survey and planning through to testing, charging and commissioning support.
CHOOSE YOUR PROPERTY
Go straight to the information that fits your property, then send the details for a clear first response.
Quiet single-room, multi-split and ducted systems for comfortable homes.
View home air conditioning → 02Reliable cooling and heating planned around customers, trading hours and appearance.
View shop air conditioning → 03Efficient comfort systems for individual rooms, open-plan floors and complete workplaces.
View office air conditioning →DIRECT COMMERCIAL SUPPORT
UK Cooling and Heating Services Ltd supports principal contractors, M&E contractors, facilities providers and end users with precision cooling, specialist commercial air-conditioning and HVAC delivery.
We plan work around live buildings, access, programme and other trades. You get clear technical communication, a defined quotation and one point of contact from the first survey through to handover.
Discuss a commercial projectSERVICES
Installation, replacement, planned maintenance and technically led remedial work.
New installations, replacements and alterations for commercial buildings and occupied sites.
Wall-mounted, cassette and ducted systems for offices, retail, hospitality and specialist spaces.
Close-control cooling replacement programmes for data centres, live manufacturing and technical environments.
View precision cooling → 04Refrigeration pipework, condensers, testing, evacuation, charging and commissioning support.
View capability →Controlled refrigerant recovery, equipment removal, replacement and compliant waste transfer.
Planned servicing, leak investigation, controls checks, breakdown support and remedial work.
ASHP installation, replacement and system integration for commercial buildings, with suitable home projects covered separately.
Commissioning and technical verification of complex systems, including addressing, controls setup, operating checks, service-tool analysis and handover records.
ENGINEERING-LED DELIVERY
Site assessment, equipment review and a quotation that sets out inclusions, exclusions and interfaces.
Practical planning around access, shutdowns, occupied areas and other trades.
Pressure testing, evacuation and detailed commissioning of complex VRV/VRF systems, with clear close-out documentation.
SELECTED INSTALLATIONS
A selection of UKCH installations showing multi-unit systems, close-control equipment and technically demanding commercial pipework.
STULZ CCU replacementSeven units, 14 circuits and a live manufacturing programmeView project report →
Pharmaceutical Hybrid VRF installationFour Mitsubishi Electric R32 systems within a major construction programmeView project report →
25-unit Mitsubishi VRF installationComplete AC package for a new healthcare facilityView project report →
Have a similar project?
Send UKCH the detailsLOCAL AIR CONDITIONING
Alongside our larger commercial projects, UKCH provides split, multi-split, ducted and air-source heat-pump solutions for suitable properties across the South East.
The dedicated page keeps local enquiries straightforward without diluting our specialist commercial capability.
View home & local servicesGood fit for UKCH
SECTORS
Work is planned around building users, access, site controls and programme requirements.
WHY UKCH
With UKCH, you keep direct technical contact from enquiry and survey through to delivery. That keeps the technical decisions, commercial scope and site reality connected.
Clear answers without messages passing through layers of sales staff.
Scope, interfaces, assumptions and exclusions set out before work starts.
Planning that reflects access, shutdowns, building users and other trades.
Testing, commissioning and close-out information matched to the work completed.
START AN ENQUIRY
For a quicker first response, include the location, equipment details, timescale and any drawings or photographs you have.
James Newland, Director